格化粪池设计施工与管理使用基本要求
格化粪池设计施工与管理使用基本要求
Basic Requirements for Design, Construction, Management and Use of Latticed Septic Tank
化粪池容积:化粪池的有效容积应保证粪便的贮存时间不少于标准的要求,第一池20天,第二池10天,第三池30天。总容积不得小于1.5m3。第一、二、三池的容积比例为2:1:3,在2池容积不足0.5 m3时,可按0.5 m3设计施工。
Septic tank volume: the effective volume of septic tanks should ensure that the storage time of feces is not less than the standard requirements. The first pool is 20 days, the second pools are 10 days, and the third pools are 30 days. The total volume should not be less than 1.5m3. The volume ratio of the first, second, third tank is 2:1:3. When the volume of the 2 tank is less than 0.5 m3, it can be designed and constructed according to 0.5 m3.
化粪池深度:有效深度不少于1000mm,化粪池的上部应留有空间。
Septic tank depth: effective depth of not less than 1000mm, the upper part of septic tanks should be left with space.
过粪管位置:三格池的格与格之间设有连通管,也称过粪管,用管内径10—15cm的塑料管为宜。 过粪管应安装在两堵隔墙上,与隔墙的水平夹角呈60°;也可安装倒L型过粪管。其中第一池到第二池过粪管下端(即粪液进口)位置在第一池的下1/3处,上端在第二池距池顶150mm;第二池到第三池过粪管下端(即粪液进口)位置在第二池的下1/3或中部1/2处,上端在第三池距池顶150mm。
The position of excrement tube: there is a connecting pipe between the grid and the grid of the three grid, also known as the excrement tube, and the plastic pipe with a diameter of 10 to 15cm is suitable. The excrement tube should be installed on the two partition walls, the angle between the horizontal wall and the partition wall is 60 degrees, and the inverted L type excrement tube can also be installed. In the first pool, the lower end of the second pool of the manure tube (the inlet of the fecal fluid) is at the lower 1/3 of the first pool, the upper end is at the top of the second pool and the top of the pool, and the lower end of the second pool to the third pool of the fecal tube (the fecal fluid inlet) is at the lower 1/3 or central 1/2 of the second pool, and the upper end is 150mm at the top of the third pool.
便器位置:以便器下口中心为基础,距后墙350mm,距边墙400mm。
Toilet position: for the center of the bottom outlet, 350mm from the back wall and 400mm from the side wall.
进粪管:坡度1/5(便器下口与进粪管下沿连线与水平面形成的夹角约10度)。进、出粪管和污水管直径:200—300mm。
Enter the feces tube: the slope is 1/5 (the angle between the lower part of the toilet and the bottom of the excrement tube is about 10 degrees from the horizontal plane). The diameter of inlet and outlet tube and sewer pipe: 200 - 300mm.
分流:生活污水不得接入化粪池,粪水与污水应分流。
Diversion: domestic sewage should not be connected to septic tanks, and fecal water should be diverted from sewage.
防臭:应在第一池安装排气管,其高度应超出厕屋500mm。
Deodorant: the exhaust pipe should be installed in the first pool, and its height should exceed the toilet 500mm.
启用:正式启用前在第一格池内注入100~200L水,水位应高出过粪管下端口。
Commissioning: 100 to 200L water is injected into the first pool before the official opening. The water level should be higher than the port under the dung tube.
用水:用水量以每人每天3~4L为宜。
Water: it is appropriate to use water for 3 ~ 4L per person per person per day.
清掏:半年至1年要清渣,粪渣与粪皮应经高温堆肥或化学法进行无害化处理,第三池的粪水可直接施肥。
Clean out: half to 1 years to clear slag, dung residue and dung skin should be treated by high temperature compost or chemical harmless treatment, and third dung water can be directly fertilized.
安全:化粪池盖板要预留出粪口并盖严,防止意外发生。清渣和取粪水时,不得在池边点灯、吸烟,防沼气遇火爆炸。
Safety: septic tank cover should be set aside and covered strictly to prevent accidents. When clearing residue and fetching dung water, do not light or smoke at the side of the pool.
施工
construction
1、选址:改厕的目的是让农民用上清洁卫生厕所,如选址不当,直接影响农民使用卫生厕所积极性,因此卫生厕所的选址要因地制宜,根据农户居室位置、庭院大小、当地生活习惯以及建厕类型等因素来确定,不能搞统一模式。
1, site selection: the purpose of replacing the toilet is to allow farmers to use sanitary toilets, such as improper location, which directly affect the enthusiasm of farmers to use sanitary toilets. Therefore, the location of sanitary toilets should be determined according to local conditions, according to the location of the household, the size of the courtyard, the local living habits and the construction of the toilet type, so that the unified model can not be made. .
2、材料准备:在施工之前,施工人员按施工需要,备足砖、水泥(425#)、砂石、钢筋、蹲便器、进粪管、连通管等材料,方可施工。
2, material preparation: before the construction, the construction personnel according to the construction needs, spare bricks, cement (425#), sand, steel, crouching, dung pipe, connecting pipe and other materials, can be constructed.
3、放样和挖坑:根据用户需要和具体情况,选好化粪池的位置、确定形状和池子的大小,量好尺寸撒上石灰线。放线时应留出砖砌或现浇余地,一般每条边放15cm。放线完了以后,掏出坑内的泥土。土坑的深度应大于130cm。
3, lofting and digging: according to the needs of users and specific circumstances, choose the location of septic tanks, determine the shape and size of the pond, and measure the size and spread the lime line. When placing the line, bricks or cast-in-place leeway should be left, and 15cm should be placed on each side. After the line was finished, it took out the soil in the pit. The depth of the pit should be greater than 130cm.